Disco2Guy
03-16-2008, 01:10 AM
Well now technically it was yesterday. My friend Chris and I drove up to San Rafael to do the work in a friends auto shop garage. It all went without a hitch, even the RivNuts. It took about 3 hours to get the first one on and 45 minutes for the other side. Now RovrFlo is ready for the April MORG, and hopefully by May I'll have the CDL shifter installed.
I'm glad I got the slider step too. It'll be a lot easier to get the surfboards up and down with wet booties on.
I'm glad I got the slider step too. It'll be a lot easier to get the surfboards up and down with wet booties on.